Thursday, January 13, 2011
13 line at lately- set up west two ensign station the realization change to
Head end car time:
West two ensigns stand
Head car 05:50 end car(whole distances)s 22:15
(Half distance)22:30 half distance the terminal station is the station of Zhu Xin Zhuang
The south Shao stands
Head car 06:00 end car(whole distances)s 22:00
(Half distance)22:45 half distance the terminal christian louboutin shoes station is the station of Zhu Xin Zhuang
Change to a station:
With No.13 line at lately- set up west two ensign station the realization change to.In addition, Chang even line Zhu Xin Zhuang stands future will and the subway No.8 line 2 contact a line realization to change to.
P+R parking lot:
Prepare to establish 8, provide 1500 parking lots, western two ensigns station, south Shao station, Gong is turning respectively city station, the sand river Gao Jiao Yuan is station is each to establish a , life science park station, Zhu Xin Zhuang stood to then establish 2 respectively.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment